maandag 31 december 2007

Merry Christmas and a Happy New Year

31 December 2007, the last day of the year. I hope that everyone has a fine christmas and I wish everyone a happy and healthy 2008. Please enjoy the last few hours of 2007 and be carefull with all the fireworks.

Demolishing bathroom Picture Update

As promissed the latest pictures.





zondag 30 december 2007

Demolishing bathroom UPDATE

Hello everyone. Sorry for not posting any updates on the bathroom. It has been a busy time for us, but the bathroom is in progress. After my last post, all the pipelines are now in place, the build of the new toilet is ready and the drain has been placed with the new bathroom floor. The walls have been placed and jointing is also ready. I have some pictures of the last week. Tomorrow I will place the latest pictures.









woensdag 19 december 2007

Demolishing bathroom day 8

Yesterday evenning we break out the wall to our new shower cabin. What a mess, but we have a great surface now. See pictures below.


maandag 17 december 2007

Demolishing bathroom day 7

Yes all the pipelines are nog ready. Tomorrow we start beaking out the wall to our new shower cabin.


zondag 16 december 2007

Demolishing bathroom day 5 and 6

Thursday and friday we went further with our bathroom. The central outlet pipe is replaced and we have removed our shower cabin. All pipes are now placed in the walls so that our new taps can be placed directly. Next tuesday we will remove the wall to our new shower cabin and a door will be closed. Have a nice weekend to you all.






donderdag 13 december 2007

Demolishing bathroom day 4

Yesterday evening we have connected the toilet to the waterpipes and yes it works, but we have now a major problem. I have a leak in my waterpipes from the washingmachine to the central outlet pipe. I have to replace the whole pipeline now. I will do that tonight, so pictures will be posted tomorrow.



woensdag 12 december 2007

Demolishing bathroom day 3

Yesterday evening they placed the framework for the hanging toilet, see pictures below.
Friday we will demolish our shower and get the electricity in place.


dinsdag 11 december 2007

Demolishing bathroom day 2

Yesterday evening we went further on with our bathroom. The was-hand basin and central heating are now removed and the new pipings for the central heating are placed. Furthermore we have placed our bath and we have signed the pipes for the bath, see pictures below.





vrijdag 7 december 2007

Damixa G-Type V3.0 tapcollection

Last year we replaced our kitchen and bought an Damixa G-Type V3.0 kitchen mixing tap see picture below.

Damixa G-Type V3.0 - 72000

We want to use the same tap collection for our bathroom, so please check the website for the design collection of Damixa taps. We ordered the following taps:

Damixa G Type V3.0 - 72820

Damixa G Type V3.0 - 72500


Damixa G Type V3.0 - 72600


Demolishing bathroom started

Yesterday evening we starten with our new bathroom. First of all the toilet needed to be removed, after that we will remove the central heating. The hanging toilet will be adjusted and placed first. Next week we are also starting to build the walls for the bath and shower cabin.

Removing the toilet.

donderdag 6 december 2007

Our new bathroom

I've been shopping for some weeks now for a new bathroom. 2 weeks ago I ordered all my parts at Warmteservice in Lelystad. They arrived yesterday, see pictures below. Of course I will let you know the progress of the new bathroom. We're starting today with demolishing the bathroom. Pictures of this will also be posted:).