maandag 31 december 2007

zondag 30 december 2007

Demolishing bathroom UPDATE

Hello everyone. Sorry for not posting any updates on the bathroom. It has been a busy time for us, but the bathroom is in progress. After my last post, all the pipelines are now in place, the build of the new toilet is ready and the drain has been placed with the new bathroom floor. The walls have been placed and jointing is also ready. I have some pictures of the last week. Tomorrow I will place the latest pictures.









woensdag 19 december 2007

Demolishing bathroom day 8

Yesterday evenning we break out the wall to our new shower cabin. What a mess, but we have a great surface now. See pictures below.


maandag 17 december 2007

Demolishing bathroom day 7

Yes all the pipelines are nog ready. Tomorrow we start beaking out the wall to our new shower cabin.


zondag 16 december 2007

Demolishing bathroom day 5 and 6

Thursday and friday we went further with our bathroom. The central outlet pipe is replaced and we have removed our shower cabin. All pipes are now placed in the walls so that our new taps can be placed directly. Next tuesday we will remove the wall to our new shower cabin and a door will be closed. Have a nice weekend to you all.






donderdag 13 december 2007

Demolishing bathroom day 4

Yesterday evening we have connected the toilet to the waterpipes and yes it works, but we have now a major problem. I have a leak in my waterpipes from the washingmachine to the central outlet pipe. I have to replace the whole pipeline now. I will do that tonight, so pictures will be posted tomorrow.



woensdag 12 december 2007

Demolishing bathroom day 3

Yesterday evening they placed the framework for the hanging toilet, see pictures below.
Friday we will demolish our shower and get the electricity in place.